740 lines
22 KiB
Markdown
740 lines
22 KiB
Markdown
# IGNY8 Launch Tasks - Complete Implementation Guide
|
|
|
|
---
|
|
# PHASE 0 ✅ Completed
|
|
|
|
## 1. Design System Consolidation
|
|
|
|
✅ Update the rules files, a follow the rules in all changes for styles, for components, for coding rules, to use consistent design
|
|
|
|
---
|
|
|
|
## 2. Visual Verifications
|
|
|
|
2.1 ✅ - All logos and images to update for dark and light color scheme layout, and logo design final as well as favicon, and move images to right folder
|
|
2.2 ✅ - Sidebar menu rearrange for items that need rearranging, and reduce padding/spacing
|
|
2.3 ✅ - Fix the sidebar active/selected menu and hover color
|
|
2.4 ✅ - Assign manually the colors to each module, and verify and fix that in each page and progress bar consistent colors are used, across module pages, automation and dashboard
|
|
2.5 ✅ - Use colors in setup, sites and account and all its subpages
|
|
|
|
---
|
|
|
|
## 3. AI Provider Configuration
|
|
|
|
3.1 ✅ - Add Bria image generation and verify that DALL-E and Bria image generation are working
|
|
3.2 ✅ - Add and verify Claude API and models
|
|
3.3 ✅ - Update the 2 image sizes to be landscape and 2 square, and update the template to use full width image on full section, and half width content section
|
|
|
|
---
|
|
# PRE-LAUNCH PHASE 1: Code Cleanup & Technical Debt ✅
|
|
|
|
> **Goal:** Clean, maintainable codebase before production lock
|
|
> **Status:** Completed January 9, 2026
|
|
> **Commits:** 4 commits, -3,218 lines removed, 24 files changed
|
|
|
|
## 1.1 - Legacy Code Cleanup ✅
|
|
|
|
### 1.1.1 - Identify Legacy Items ✅
|
|
**Action:** Audit and document all unused code
|
|
|
|
- [x] Unused pages in `frontend/src/pages/` - Removed 11 empty folders
|
|
- [x] Unused routes in `App.tsx` - Cleaned up
|
|
- [x] Unused components in `frontend/src/components/` - Removed empty folders
|
|
- [x] Unused API endpoints in backend - N/A (all in use)
|
|
- [x] Deprecated documentation references - Updated
|
|
|
|
### 1.1.2 - Remove Legacy Code ✅
|
|
- [x] Remove identified unused pages - Removed test files, empty folders
|
|
- [x] Remove orphaned routes - Cleaned up
|
|
- [x] Remove unused components - Removed 11 empty folders
|
|
- [x] Remove deprecated API endpoints - N/A
|
|
- [x] Update documentation to reflect removals - Updated
|
|
|
|
### 1.1.3 - Code Quality Verification ✅
|
|
- [x] Run ESLint with design system rules - Passed
|
|
- [x] Fix any design system violations - None found
|
|
- [x] Verify TypeScript strict mode compliance - Passed
|
|
- [x] Check for console.log/debug statements - Removed 17 instances
|
|
|
|
---
|
|
|
|
# PRE-LAUNCH PHASE 4: Email & Notifications QA ✅
|
|
|
|
> **Goal:** Reliable email delivery and notification system
|
|
> **Status:** Completed January 9, 2026
|
|
|
|
## 4.1 - Email Deliverability Testing ✅
|
|
|
|
### 4.1.1 - Spam Score Testing
|
|
- [x] Test Resend emails with mail-tester.com
|
|
- [x] Document spam score results
|
|
- [x] Address any deliverability issues
|
|
|
|
### 4.1.2 - Email Trigger Verification
|
|
|
|
| Trigger | Email Type | Service | Tested |
|
|
|---------|------------|---------|--------|
|
|
| User Registration | Welcome email | Resend | ✅ |
|
|
| Email Verification | Verification link | Resend | ✅ |
|
|
| Password Reset | Reset link | Resend | ✅ |
|
|
| Password Changed | Confirmation | Resend | ✅ |
|
|
| Plan Upgrade | Confirmation | Resend | ✅ |
|
|
| Payment Success | Receipt | Resend | ✅ |
|
|
| Payment Failed | Alert | Resend | ✅ |
|
|
| Automation Complete | Notification | Resend | ✅ |
|
|
| Content Ready | Notification | Resend | ✅ |
|
|
|
|
### 4.1.3 - Acceptable Deliverability Standards
|
|
- Target: 95%+ inbox placement ✅
|
|
- Bounce rate: <5% ✅
|
|
- Spam complaint rate: <0.1% ✅
|
|
|
|
## 4.2 - In-App Notifications ✅
|
|
- [x] Verify notification bell updates in real-time
|
|
- [x] Test notification read/unread states
|
|
- [x] Verify notification dropdown functionality
|
|
- [x] Check notifications page `/account/notifications`
|
|
|
|
---
|
|
|
|
# PRE-LAUNCH PHASE 5: UX Improvements ✅
|
|
|
|
> **Goal:** Polished user experience for production
|
|
> **Status:** Completed January 9, 2026
|
|
> **Focus:** Enhanced search modal with filters, suggestions, and help integration
|
|
|
|
## 5.1 - Search Modal Enhancement ✅
|
|
|
|
**Current:** Enhanced with comprehensive features
|
|
**Completed:** Full search experience with help integration
|
|
|
|
### Improvements: ✅
|
|
- [x] Add search filters (by type: keyword, content, site, etc.) - Implemented with category badges
|
|
- [x] Add recent searches history - Implemented (stored in localStorage)
|
|
- [x] Improve search results display with context - Added context snippets with highlighting
|
|
- [x] Add keyboard shortcuts (Cmd/Ctrl + K) - Already implemented
|
|
- [x] Quick actions from search results - Implemented with suggested questions
|
|
- [x] **Bonus:** Added help knowledge base with 25+ questions across 8 topics
|
|
- [x] **Bonus:** Added smart phrase matching (strips filler words, handles plurals)
|
|
- [x] **Bonus:** Added comprehensive keyword coverage (task, cluster, billing, invoice, etc.)
|
|
|
|
## 5.2 - Image Regeneration Feature ⏸️
|
|
|
|
> **Status:** Deferred to post-launch (Phase 9)
|
|
> **Reason:** Current image generation is stable; regeneration is enhancement not critical for launch
|
|
|
|
## 5.3 - User Flow Polish ✅
|
|
|
|
> **Status:** Verified working - Ready for Phase 7 user testing
|
|
|
|
### Signup to First Content Flow ✅
|
|
1. [x] User signs up → verify smooth flow - Working
|
|
2. [x] Onboarding wizard → verify all steps work - Functional
|
|
3. [x] Add site → verify WordPress integration - Stable
|
|
4. [x] Add keywords → verify import works - Working
|
|
5. [x] Run clustering → verify AI works - Functional
|
|
6. [ ] Generate content → verify output quality - (Pending Phase 7 testing)
|
|
7. [ ] Publish to WordPress → verify integration - (Pending Phase 7 testing)
|
|
|
|
---
|
|
|
|
# PRE-LAUNCH PHASE 6: Data Backup & Cleanup ✅
|
|
|
|
> **Goal:** Fresh database for production launch
|
|
> **Status:** Completed January 9, 2026
|
|
> **Deliverables:** Django management commands + comprehensive documentation
|
|
|
|
## 6.1 - System Configuration Backup ✅
|
|
|
|
### 6.1.1 - Export System Data
|
|
**Keep these (system configuration):**
|
|
|
|
| Model Group | Export Format | Location |
|
|
|-------------|---------------|----------|
|
|
| Plans | JSON | `/backups/config/plans.json` |
|
|
| AIModelConfig | JSON | `/backups/config/ai_models.json` |
|
|
| CreditCostConfig | JSON | `/backups/config/credit_costs.json` |
|
|
| GlobalIntegrationSettings | JSON | `/backups/config/integrations.json` |
|
|
| SystemSettings | JSON | `/backups/config/system.json` |
|
|
| Prompts | JSON | `/backups/config/prompts.json` |
|
|
| AuthorProfiles | JSON | `/backups/config/authors.json` |
|
|
| Industries & Sectors | JSON | `/backups/config/industries.json` |
|
|
| SeedKeywords | JSON | `/backups/config/seed_keywords.json` |
|
|
|
|
### 6.1.2 - Document Configuration Values ✅
|
|
- [x] Export all Plan configurations - Command: `export_system_config`
|
|
- [x] Export all AI model settings - Included in export
|
|
- [x] Export all prompt templates - Included in export
|
|
- [x] Export all system settings - Included in export
|
|
- [x] Store in version control - Ready to commit before V1.0
|
|
|
|
**Implementation:** `/backend/igny8_core/management/commands/export_system_config.py`
|
|
**Usage:** `python manage.py export_system_config --output=/backups/v1-config.json`
|
|
|
|
## 6.2 - User Data Cleanup ✅
|
|
|
|
### 6.2.1 - Clear User-Generated Data ✅
|
|
**Remove ALL user-specific data:**
|
|
|
|
- [x] All Sites (except internal test sites) - Command ready
|
|
- [x] All Keywords - Command ready
|
|
- [x] All Clusters - Command ready
|
|
- [x] All Content Ideas - Command ready
|
|
- [x] All Tasks - Command ready
|
|
- [x] All Content - Command ready
|
|
- [x] All Images - Command ready
|
|
- [x] All Automation Runs - Command ready
|
|
- [x] All Publishing Records - Command ready
|
|
- [x] All Sync Events - Command ready
|
|
- [x] All Credit Transactions (except system) - Command ready
|
|
- [x] All Credit Usage Logs - Command ready
|
|
- [x] All Notifications - Command ready
|
|
|
|
**Implementation:** `/backend/igny8_core/management/commands/cleanup_user_data.py`
|
|
**Usage:** `python manage.py cleanup_user_data --confirm`
|
|
**Safety:** Includes dry-run mode, confirmation prompts, atomic transactions
|
|
|
|
### 6.2.2 - Clear Logs ✅
|
|
- [x] Application logs - Manual cleanup script provided
|
|
- [x] Celery task logs - Manual cleanup script provided
|
|
- [x] Automation logs - Covered by cleanup command
|
|
- [x] Publishing sync logs - Covered by cleanup command
|
|
- [x] Error logs - Manual cleanup documented
|
|
|
|
### 6.2.3 - Clear Media Storage ✅
|
|
- [x] Remove all generated images - Included in cleanup command
|
|
- [x] Clear CDN cache if applicable - Documented
|
|
- [x] Verify storage is empty - Verification steps included
|
|
|
|
**Documentation:** `/docs/plans/PHASE-6-BACKUP-CLEANUP-GUIDE.md` (300+ lines)
|
|
|
|
## 6.3 - V1.0 Configuration Lock ⏳
|
|
|
|
> **Status:** Ready to execute before V1.0 deployment
|
|
> **Note:** Commands and documentation prepared, will run during Phase 8 deployment
|
|
|
|
---
|
|
|
|
# PHASE 1: App UI Quick Fixes
|
|
|
|
## 1.1 - Credits Display Fix ✅
|
|
|
|
**Location**: App header component
|
|
|
|
**Current**: Shows abbreviated format (e.g., "12k")
|
|
|
|
**Required**: Show full number (e.g., "12,000")
|
|
|
|
---
|
|
|
|
## 1.2 - Sites Card Redesign ✅
|
|
|
|
**Location**: Sites listing/grid component
|
|
|
|
**Changes required**:
|
|
- Reduce padding to half of current value
|
|
- Use smaller badges for all 3 badges
|
|
- Move URL to below the site title (currently beside or above)
|
|
- Show description only when not empty (hide element completely if empty)
|
|
|
|
---
|
|
|
|
## 1.3 - Page Loading Standardization ✅
|
|
|
|
**Current problem**: Each page has its own loading spinner/text implementation
|
|
|
|
**Required solution**:
|
|
- Remove all individual page loading implementations
|
|
- Implement loading state in global app wrapper (same component where sidebar/header resides)
|
|
- Single consistent spinner/text across entire app
|
|
- Same approach as standard page margins/padding (defined once globally)
|
|
|
|
**Location**: App layout wrapper component (where sidebar/header are defined)
|
|
|
|
---
|
|
|
|
## 1.4 - Global Layout Spacing ✅
|
|
|
|
**Required**:
|
|
- Define exact padding in global app layout ONLY:
|
|
- Below header: 12px
|
|
- After sidebar: 12px
|
|
- Top/bottom: 12px
|
|
- Left/right: 12px
|
|
- Remove ALL inner margins and padding from internal page main wrappers
|
|
- Every page should inherit spacing from global layout, not define its own
|
|
|
|
**Location**: Global app layout component
|
|
|
|
---
|
|
|
|
## 1.5 - Button Standardization ✅
|
|
|
|
**Current problems**:
|
|
1. Icon-on-top bug: Some buttons render icon above text instead of inline
|
|
2. Inconsistent `type` attribute: Some buttons have `type="button"`, some don't
|
|
3. No unified component usage across app
|
|
|
|
**Required solution**:
|
|
|
|
Create/enforce global button components for each variant:
|
|
|
|
| Variant | Component | Usage |
|
|
|---------|-----------|-------|
|
|
| Standard button | `<Button>` | Default actions |
|
|
| Button with icon | `<Button icon={...}>` | Actions with icon left/right of text |
|
|
| Icon-only button | `<IconButton>` | Toolbar actions, compact UI |
|
|
| Button group | `<ButtonGroup>` | Related actions grouped together |
|
|
| Toggle button | `<ToggleButton>` | On/off states |
|
|
|
|
**Implementation requirements**:
|
|
- All variants should NOT require `type="button"` in the HTML output (handle internally in component)
|
|
- Icon must render INLINE with text (flex row), never on top (flex column)
|
|
- Single source of truth for each button type
|
|
- Audit entire codebase and replace all ad-hoc button implementations
|
|
|
|
**Audit command**:
|
|
```bash
|
|
grep -rn "<button" src/ --include="*.jsx" --include="*.tsx"
|
|
```
|
|
|
|
---
|
|
|
|
## 1.6 - Legacy Cleanup ❌
|
|
|
|
**Action**: Remove all unused pages, routes, and related data from:
|
|
- System codebase
|
|
- Documentation
|
|
|
|
**Note**: Identify specific legacy items before removal
|
|
|
|
---
|
|
|
|
# PHASE 2: App Features & Improvements
|
|
|
|
## 2.1 - Setup Wizard Redesign ✅
|
|
|
|
**Current problems**:
|
|
- Converted from modal - not a good design
|
|
- Unnecessary header and icon on wizard main page
|
|
- Unclear intro cards
|
|
|
|
**Required changes**:
|
|
1. Convert to proper page style (like other app pages)
|
|
2. Remove unnecessary header from wizard main page
|
|
3. Create cleaner, better intro cards that clearly explain:
|
|
- What is being provided through wizard
|
|
- What each step accomplishes
|
|
- What user will have after completion
|
|
|
|
---
|
|
|
|
## 2.2 - Dashboard Widgets (3 new) ✅
|
|
|
|
**Location**: Home/Dashboard page
|
|
|
|
### Widget 1: Sites Overview ✅
|
|
- Show sites with small data/status info
|
|
- Include action buttons to directly navigate to:
|
|
- Site settings
|
|
- Site actions
|
|
- Compact format showing key site health indicators
|
|
|
|
### Widget 2: Credits Usage ✅
|
|
- Remaining credits display
|
|
- AI runs count
|
|
- Style: Match existing site dashboard widget style
|
|
- Visual progress indicator for usage
|
|
|
|
### Widget 3: Account Info ✅
|
|
Display the following account-related information:
|
|
- Credits consumed (this billing period)
|
|
- Credits remaining
|
|
- Reset day (when credits refresh)
|
|
- Last payment date
|
|
- Next payment due date
|
|
- Current plan/package type
|
|
|
|
**Note**: Evaluate and track what account-related info is most valuable to display
|
|
|
|
---
|
|
|
|
## 2.3 - WordPress & Content Templates ❌
|
|
|
|
### 2.3.1 - Post Template Optimization
|
|
- Review and optimize WordPress post template structure
|
|
- Improve SEO elements
|
|
- Ensure clean HTML output
|
|
|
|
### 2.3.2 - Header Section Cleanup
|
|
**Current**: Shows various tags including non-public/non-SEO-friendly ones
|
|
|
|
**Required**:
|
|
- Show ONLY publicly visible, SEO-friendly tags
|
|
- Show ONLY tags that are working/functional
|
|
- Remove all other tags from header section
|
|
|
|
---
|
|
|
|
# PHASE 3: Credits, Pricing & Payments
|
|
|
|
## 3.1 - Credits Structure ✅
|
|
|
|
### 3.1.1 - Token Costing ✅
|
|
- Finalize credits token costing
|
|
- Define limits per plan
|
|
- Document per-plan structure
|
|
|
|
### 3.1.2 - Pricing Display ✅
|
|
- Finalize what to show in pricing plans on frontend
|
|
- Finalize what to show in pricing plans in-app
|
|
- Ensure consistency between both
|
|
|
|
### 3.1.3 - Subscription Verification ✅
|
|
- Verify correct renewal date logic
|
|
- Verify correct reset of credits date
|
|
- Test edge cases (upgrades, downgrades, mid-cycle changes)
|
|
|
|
---
|
|
|
|
## 3.2 - Payment Integration ✅
|
|
|
|
### 3.2.1 - Stripe Integration ✅
|
|
- Full payment flow integration
|
|
- Subscription management
|
|
- Webhook handling
|
|
|
|
### 3.2.2 - PayPal Integration ✅
|
|
- Full payment flow integration
|
|
- Subscription management
|
|
- Webhook handling
|
|
|
|
---
|
|
|
|
## 3.3 - Plans & Packages ✅
|
|
|
|
### 3.3.1 - Upgrade Flow ✅
|
|
- Credits package upgrade flow
|
|
- Plan upgrade flow
|
|
- Proration handling
|
|
|
|
### 3.3.2 - Service Packages ✅
|
|
Create two package types:
|
|
|
|
| Package | Type | Includes |
|
|
|---------|------|----------|
|
|
| Setup App | One-time | Initial configuration, onboarding |
|
|
| Campaign Management | Monthly | Keyword selection, ongoing management |
|
|
|
|
---
|
|
|
|
# PHASE 4: Email Setup ✅
|
|
|
|
## 4.1 - Email Services ✅
|
|
|
|
| Use Case | Service | Free Limit | Why |
|
|
|----------|---------|------------|-----|
|
|
| **Transactional** | **Resend** | 3,000/mo | Better deliverability, faster delivery, cleaner API |
|
|
| **Marketing** | **Brevo** | 9,000/mo | Higher volume, built-in templates, unsubscribe management, analytics |
|
|
|
|
**Total free capacity**: 12,000 emails/month
|
|
|
|
---
|
|
|
|
## 4.2 - Email Implementation ✅
|
|
|
|
### 4.2.1 - Service Configuration ✅
|
|
- Configure Resend for transactional emails
|
|
- Configure Brevo for marketing emails
|
|
- Set up API keys and authentication
|
|
|
|
### 4.2.2 - App Integration ✅
|
|
- Integrate both providers into app backend
|
|
- Create email service abstraction layer
|
|
- Route emails to correct provider based on type
|
|
|
|
### 4.2.3 - Email Triggers Definition ✅
|
|
Define and configure when emails are triggered:
|
|
|
|
| Email Type | Trigger | Service |
|
|
|------------|---------|---------|
|
|
| Signup confirmation | User registration | Resend |
|
|
| Password reset | User request | Resend |
|
|
| Alert notifications | System events | Resend |
|
|
| Newsletters | Scheduled/manual | Brevo |
|
|
| Marketing campaigns | Scheduled/manual | Brevo |
|
|
|
|
**Action**: Audit backend/frontend to ensure all triggers are configured
|
|
|
|
### 4.2.4 - Mail History Log ✅
|
|
**Requirements**:
|
|
- Store small mail details (not full content)
|
|
- Archive every 30 days
|
|
- Compact format to minimize database clutter
|
|
- Must remain accessible for later reference
|
|
|
|
**Suggested schema**:
|
|
```
|
|
- id
|
|
- email_type (transactional/marketing)
|
|
- recipient_email (hashed or partial)
|
|
- subject_summary
|
|
- status (sent/failed/bounced)
|
|
- sent_at
|
|
- archived_at
|
|
```
|
|
|
|
### 4.2.5 - Verification ✅
|
|
- Verify all signup emails sending successfully
|
|
- Verify all alert emails sending successfully
|
|
- Verify all notification emails sending successfully
|
|
- Create test suite for email delivery
|
|
|
|
---
|
|
|
|
# PHASE 5: Pipeline & Testing
|
|
|
|
## 5.1 - Pipeline Verification
|
|
|
|
- Run complete manual pipeline end-to-end
|
|
- Run complete automated pipeline end-to-end
|
|
- Document and fix any issues found
|
|
|
|
---
|
|
|
|
## 5.2 - QA & Testing
|
|
|
|
### 5.2.1 - CRUD Operations
|
|
- Collect current CRUD implementation from codebase
|
|
- Visually verify each operation
|
|
- Functionally verify each operation manually
|
|
- Document any issues
|
|
|
|
### 5.2.2 - Automation Pipeline
|
|
- Full end-to-end test
|
|
- From clustering to publishing
|
|
- Verify each stage completes correctly
|
|
|
|
### 5.2.3 - Credits Accuracy
|
|
- Verify accurate credits consumption
|
|
- Verify accurate cost calculations
|
|
- Test edge cases (zero credits, negative, overflow)
|
|
|
|
---
|
|
|
|
# PHASE 6: Data Cleanup & Deployment
|
|
|
|
## 6.1 - Data Cleanup
|
|
|
|
Clear ALL IGNY8 data:
|
|
- Sites
|
|
- Images
|
|
- Content
|
|
- All database tables
|
|
- All logs
|
|
|
|
---
|
|
|
|
## 6.2 - V1.0 Configuration Lock
|
|
|
|
- Final configuration lock for V1.0 release
|
|
- Document all configuration values
|
|
- No changes after lock without version bump
|
|
|
|
---
|
|
|
|
## 6.3 - User Testing
|
|
|
|
### New User Signup Test
|
|
- Signup 3 new users on Starter plan - verify
|
|
- Signup 3 new users on Growth plan - verify
|
|
- Signup 3 new users on Scale plan - verify
|
|
|
|
### Personal Deployment
|
|
- Use own account to deploy personal sites
|
|
|
|
---
|
|
|
|
## 6.4 - Site Deployments
|
|
|
|
Deploy and verify the following sites:
|
|
- [ ] homeg8.com
|
|
- [ ] massagersmart.com
|
|
- [ ] Alorig.com
|
|
- [ ] SalmanSadiq.com
|
|
- [ ] AIAI.pk
|
|
|
|
---
|
|
|
|
# PHASE 7: Documentation & Media
|
|
|
|
## 7.1 - Documentation Updates ✅
|
|
|
|
- ✅ Update all feature documentation
|
|
- ✅ Finalize help documentation
|
|
- ✅ Ensure accuracy with V1.0 release features
|
|
|
|
**Completed Items**:
|
|
- Updated docs/INDEX.md to v1.6.1
|
|
- Updated CHANGELOG.md with v1.6.1 release details
|
|
- Updated Help.tsx with 8-stage pipeline, visual flowcharts, accurate module docs
|
|
- All documentation synced with current codebase
|
|
|
|
---
|
|
|
|
## 7.2 - Media Creation ❌
|
|
|
|
### 7.2.1 - Feature Screencasts ❌
|
|
- Create screencast of healthy data from each page
|
|
- Show real/representative data, not empty states
|
|
|
|
### 7.2.2 - Feature Explainer Videos ❌
|
|
- Create videos explaining each feature
|
|
- Focus on value proposition and use cases
|
|
|
|
### 7.2.3 - Tutorial Videos ❌
|
|
- Create functional screencasts
|
|
- How-to video tutorials for common workflows
|
|
|
|
---
|
|
|
|
# PHASE 8: Frontend Marketing Site
|
|
|
|
> ⚠️ **DEPENDENCY**: This phase can ONLY be finalized after Phase 7 documentation is complete
|
|
|
|
## 8.1 - Site Content ✅
|
|
|
|
- ✅ Complete site content based on:
|
|
- Final documentation
|
|
- Final feature set
|
|
- Help documentation
|
|
- ✅ Ensure messaging matches actual V1.0 capabilities
|
|
|
|
**Completed Items**:
|
|
- Updated Home.tsx with 8-stage pipeline and 7 automation handoffs
|
|
- Updated Product.tsx with accurate module descriptions and features
|
|
- Updated Tour.tsx with 5 detailed steps and accurate pipeline
|
|
- Updated Solutions.tsx with current architecture details
|
|
- All marketing pages synced with app architecture
|
|
|
|
---
|
|
|
|
## 8.2 - Pricing Page ✅
|
|
|
|
Simple pricing page with three plans:
|
|
|
|
| Plan | Price |
|
|
|------|-------|
|
|
| Starter | $99/mo |
|
|
| Growth | $199/mo |
|
|
| Scale | $299/mo |
|
|
|
|
- ✅ Include credits information for each plan
|
|
- ✅ Clear feature comparison
|
|
|
|
**Completed Items**:
|
|
- Updated Pricing.tsx feature matrix with accurate AI providers
|
|
- Added image generation details (5 credits basic, 25 credits premium)
|
|
- Updated with DALL-E 3, Runware, Bria providers
|
|
|
|
---
|
|
|
|
## 8.3 - Upcoming Features Section ✅
|
|
|
|
**Location**: Frontend marketing site ONLY (not in-app)
|
|
|
|
- ✅ Created dedicated `/upcoming` page with timeline-based feature groups
|
|
- ✅ Organized features into 3 phases: Feb 2026, Q2 2026, Q3-Q4 2026
|
|
- ✅ Added to footer navigation under "Resources"
|
|
|
|
**Completed Features Documented**:
|
|
|
|
**Phase 1 - Launching February 2026**:
|
|
- Linker Module (internal/external linking with clustering)
|
|
- Optimizer Module (content re-optimization engine)
|
|
|
|
**Phase 2 - Launching Q2 2026**:
|
|
- Products Pages (e-commerce product content generation)
|
|
- Services Pages (service business content engine)
|
|
- Company Pages (corporate website essentials)
|
|
|
|
**Phase 3 - Launching Q3-Q4 2026**:
|
|
- Socializer Module (multi-platform social publishing)
|
|
- Video Content Creator (AI video generation & publishing)
|
|
- Site Builder (the SEO holy grail)
|
|
- Advanced Analytics (performance insights & reporting)
|
|
|
|
**Visual Design**:
|
|
- Unique color badges for each timeline phase
|
|
- Rich visual layout with gradients and hover effects
|
|
- Feature cards with icons, descriptions, and detailed bullet points
|
|
- Consistent with existing marketing site design system
|
|
|
|
---
|
|
|
|
# Execution Summary
|
|
|
|
| Phase | Scope | Difficulty | Dependencies |
|
|
|-------|-------|------------|--------------|
|
|
| 1 | App UI quick fixes | Easy | None |
|
|
| 2 | App features | Medium | Phase 1 |
|
|
| 3 | Credits/Payments | Medium | None |
|
|
| 4 | Email setup | Medium | None |
|
|
| 5 | Pipeline/Testing | Medium | Phases 1-4 |
|
|
| 6 | Cleanup/Deploy | Medium | Phase 5 |
|
|
| 7 | Documentation | Medium | Phase 6 |
|
|
| 8 | Frontend site | Easy-Medium | **Phase 7 (hard dependency)** |
|
|
|
|
---
|
|
|
|
# Parallel Execution
|
|
|
|
**Can run simultaneously**:
|
|
- Phase 1 + Phase 3 + Phase 4 (all independent)
|
|
- Phase 2 (after Phase 1) + Phase 3 + Phase 4
|
|
|
|
**Must be sequential**:
|
|
- Phase 5 → Phase 6 → Phase 7 → Phase 8
|
|
|
|
---
|
|
|
|
# PRE-LAUNCH PHASE 2: Content & Template Optimization ✅
|
|
|
|
> **Goal:** Production-ready content generation and publishing
|
|
> **Status:** Completed January 11, 2026
|
|
|
|
## 2.1 - WordPress Post Template ✅
|
|
|
|
### 2.1.1 - Template Structure Review ✅
|
|
**Location:** Backend content generation + WordPress publishing
|
|
|
|
- [x] Review HTML output structure
|
|
- [x] Validate semantic HTML (proper H1-H6 hierarchy)
|
|
- [x] Verify responsive image handling
|
|
- [x] Check internal link formatting
|
|
|
|
### 2.1.2 - SEO Elements Optimization ✅
|
|
- [x] Meta title generation quality
|
|
- [x] Meta description generation quality
|
|
- [x] Open Graph tags implementation
|
|
- [x] Schema.org structured data
|
|
- [x] Canonical URL handling
|
|
|
|
### 2.1.3 - Clean HTML Output ✅
|
|
- [x] Remove unnecessary HTML attributes
|
|
- [x] Minimize inline styles
|
|
- [x] Ensure valid HTML5 output
|
|
- [x] Test in WordPress theme compatibility
|
|
|
|
## 2.2 - Header Section Cleanup ✅
|
|
|
|
**Current Issue:** Shows various tags including non-public/non-SEO-friendly ones
|
|
|
|
### Required Changes ✅:
|
|
- [x] Audit all tags currently shown in content headers
|
|
- [x] Keep ONLY publicly visible, SEO-friendly tags
|
|
- [x] Keep ONLY functional/working tags
|
|
- [x] Remove all internal/debug tags from user-facing content
|
|
- [x] Document final tag structure
|
|
|
|
--- |