Files
igny8/docs/plans/final-fixes.md
IGNY8 VPS (Salman) b23cb07f41 docs-plans
2025-12-29 20:32:07 +00:00

4.4 KiB

IGNY8 Launch Preparation - Task Organization


1. Critical Pre-Launch Fixes

1.1 Payment & Account System

# Task Details Priority
1 Payment method saving Individual account payment method not saving Critical
2 Country-specific methods Remove all country-specific payment methods, use only global Critical
3 Payment verification Verification of online payment method success through bank account Critical
4 Account edit form Fix issue with payment method and account-specific edit form update High

1.2 Backend Issues

# Task Details Priority
1 Django admin error Backend Django admin keywords page returning 500 error Critical
2 Delete functions Many pages delete function not working in frontend (images, image prompts, etc.) High
3 Soft deletion verification Verify soft deletion criteria and how it works across system Medium

1.3 Data Integrity

# Task Details Priority
1 Status updates Verification of all status update operations High
2 Related records deletion Verify delete and related records deletion for planner and writer module submodules High
3 CRUD verification Clear definition and verification of CRUD operations on each page High

2. Automation Pipeline Fixes

2.1 Stage Card & Metrics Issues

# Task Details Priority
1 Stage card credits Automation credit display in stage cards to be corrected Critical
2 Stage 6 image generation Image generation has different implementation than other AI functions - check how it works vs other stages to find the issue Critical
3 Progress bar metrics Stage card progress bar showing wrong counts (always 0/remaining, 0%) Critical
4 Main pipeline progress Main progress bar completes at 100% at stage 5 instead of stage 6 - needs fix Critical
5 Credits accuracy Update stage cards to read from correct backend fields/endpoints (reference: /account/usage/credits shows accurate data) High

2.2 Pipeline Verification

# Task Details Priority
1 End-to-end automation Verify complete automation pipeline runs from clustering to publishing automatically Critical
2 Credits consumption Verify accurate credits and costs consumption throughout pipeline Critical

3. AI Provider Configuration

# Task Details Priority
1 Bria integration Configuration of Bria image generation model Medium
2 Anthropic integration Configuration of Anthropic AI provider Medium

4. WordPress & Content Templates

4.1 Template Improvements

# Task Details Priority
1 Blog post template Use same content template design as IGNY8 app in WordPress High
2 Image handling If only 3 images available, use them twice in template High
3 Content length variants Adjust templates and prompts for all 3 content lengths (500, 1000, 1500 words) High
4 Hub page template Create landing page style template for cluster hub pages High
5 Archive templates Apply hub template to category/tag archive term pages Medium
6 Theme integration Apply same layout/design with theme's colors for blog posts Medium

5. Frontend Marketing Site

# Task Details Priority
1 Site content update Complete site content based on final docs, features, and help documentation High
2 Pricing page Simple pricing page with plans (Starter $49, Growth $149, Scale $349) High

6. Major Refactoring (High Effort)

6.1 Design System Consolidation

Phase Task Details
1 - Audit Component inventory Collect all page styling info: buttons, icons, colors, tables, standard components
2 - Analysis Source mapping Document what format and from which sources styles are being used
3 - Cleanup Remove duplicates Remove duplicate components and CSS styling systems
4 - Refactor Standardize Refactor complete system to use single standard styling and layouts
5 - Verify Design system check Ensure only initially planned standard styling remains